NOVEMBER 2020 • SKYY9 CENTRE CONSTRUCTION PROGRESS
THE RIGHT MOVE
PAY LESS, GET MORE
In these cost-conscious times, making the right move is more important than ever. SKYY9 Centre provides great value for money for business in 2021.
Energy-optimized, Destination-Controlled lifts will whisk employees to their floors at 6 meters per second. The office areas will be separated in to two zones, low and high, avoiding congestion during peak times.
Column free design office spaces extend from 91 sq.m. to 1,413 sq.m., complete with private exclusive bathrooms with optional pantry and shower facilities. State-of-the-art office security systems, CCTV monitoring, and 24-hour security guards, enable building users to operate around the clock.
Over 200 EV car park charging stations can be made available for office tenants and visitors within the SKYY9 Centre car park management systems. Tenants can even benefit from personal golf bag-sized lockers at assigned parking bays.
Dust pollution and the health hazards it presents, has come back into the news in the past few weeks. The SKYY9 Centre PM 2.5 air filtration system throughout all parts of the buildings ensures that occupants and visitors alike will enjoy a pollution-free environment.
Finished painting on the property west wall
Installation of Chilled Water Pumps on 8th Floor
Office Tower Façade is finished
Marketing Suite on 9th Floor